L5600 HCPCS Level II code: Preparatory, hip disarticulation-hemipelvectomy, pylon, no cover, sach foot, laminated socket, molded to patient model
L5600 is the HCPCS code for “Preparatory, hip disarticulation-hemipelvectomy, pylon, no cover, sach foot, laminated socket, molded to patient model” in CMS’s October 2026 release, in effect from Oct 1, 2026.
Official description
L5600Preparatory, hip disarticulation-hemipelvectomy, pylon, no cover, sach foot, laminated socket, molded to patient model
Short description: Hip disart sach laminat mold
HCPCS · United States
Medicare details
The indicators CMS publishes with L5600 in its October 2026 file. They describe Medicare’s handling, not another payer’s.
- Medicare coverage
- Carrier judgment
- Medicare pricing
- DMEPOS fee schedule – Orthotics, prosthetics, prosthetic devices & vision services (price subject to floors and ceilings)
- Type of service
- Lump sum purchase of DME, prosthetics, orthotics
- BETOS category
- Prosthetic/Orthotic devices
- Added
- Jan 1, 1989
Where L5600 sits
- 1L codesOrthotics and prosthetics
- 2Active code L5600Preparatory, hip disarticulation-hemipelvectomy, pylon, no cover, sach foot, laminated socket, molded to patient model
Source and release
- Data release
- HCPCS Level II · October 2026
- Effective date
- Oct 1, 2026
- Publisher
- CMS
This page is built from the HCPCS Level II catalog that Vero Codes reads when it suggests codes: Centers for Medicare & Medicaid Services’s October 2026 release, imported from the publisher’s file and checked against it. The description, notes and structured data come from the same record.
Frequently asked questions
What does HCPCS code L5600 mean?
L5600 is the HCPCS code for “Preparatory, hip disarticulation-hemipelvectomy, pylon, no cover, sach foot, laminated socket, molded to patient model” in CMS’s HCPCS Level II October 2026 release.
Does Medicare cover L5600?
CMS lists L5600’s Medicare coverage as “Carrier judgment” and its pricing as “DMEPOS fee schedule – Orthotics, prosthetics, prosthetic devices & vision services (price subject to floors and ceilings)”. Coverage and payment still depend on the patient, the setting, the documentation and the payer.
Which HCPCS Level II release does this page use?
It uses CMS’s October 2026 release, in effect from Oct 1, 2026 to Dec 31, 2026. It is a reference: confirm the code against the current list and the payer’s rules before you submit it.
Codes beside L5600
All L codesL5560Preparatory, above knee- knee disarticulation, ischial level socket, non-alignable system, pylon, no cover, sach foot, plaster socket, molded to modelL5570Preparatory, above knee - knee disarticulation, ischial level socket, non-alignable system, pylon, no cover, sach foot, thermoplastic or equal, direct formedL5580Preparatory, above knee - knee disarticulation ischial level socket, non-alignable system, pylon, no cover, sach foot, thermoplastic or equal, molded to modelL5585Preparatory, above knee - knee disarticulation, ischial level socket, non-alignable system, pylon, no cover, sach foot, prefabricated adjustable open end socketL5590Preparatory, above knee - knee disarticulation ischial level socket, non-alignable system, pylon no cover, sach foot, laminated socket, molded to modelL5595Preparatory, hip disarticulation-hemipelvectomy, pylon, no cover, sach foot, thermoplastic or equal, molded to patient modelL5610Addition to lower extremity, endoskeletal system, above knee, hydracadence systemL5611Addition to lower extremity, endoskeletal system, above knee - knee disarticulation, 4 bar linkage, with friction swing phase controlL5613Addition to lower extremity, endoskeletal system, above knee-knee disarticulation, 4 bar linkage, with hydraulic swing phase controlL5614Addition to lower extremity, exoskeletal system, above knee-knee disarticulation, 4 bar linkage, with pneumatic swing phase controlL5615Addition, endoskeletal knee-shin system, 4 bar linkage or multiaxial, fluid swing and stance phase controlL5616Addition to lower extremity, endoskeletal system, above knee, universal multiplex system, friction swing phase control